A three-year plan is renewing the parts of the James Monroe you rely on every day: the roof over your head, the balconies and terraces, and the systems behind the walls.

2025–2027 capital planWeekly update
This week

This week in the building: done

Heads up

Heads up and coming up

Coming up

Meetings and your vote

The capital plan

Three years, three big jobs

The Board adopted a 2025–2027 plan to protect the building envelope. Each year focuses on one part of the exterior.

2025Full roof replacement and the first balcony repairs
2026Balcony repairs line by line: 6- and 9-lines finished this fall
Complete

A brand-new roof

The full roof replacement was completed in 2025, under independent engineering oversight. It protects the top floors and the equipment rooms on the roof level for decades to come.

2025completed
100%of the roof replaced
In progress · 2026

Balcony repairs, line by line

Contractors repair concrete, railings and waterproofing one vertical line of balconies at a time. If your line is next, here is what to expect.

Advance notice

You will get a BuildingLink notice with your line and dates before work starts.

Clear your balcony

Remove furniture, plants, grills and stored items before the start date.

Weekday work hours

Noisy work happens on weekdays during the day. Expect drilling while your line is active.

Access when needed

Crews may need brief access through your unit. Keep your KeyLink key current.

Under review · 2027

All 12 terraces, waterproofed

In 2027 the plan turns to the building’s terraces: structural repairs and new waterproofing to stop leaks into the units below. Terrace owners will hear from the Management Office well before work begins.

12terraces
2027timing under Board review
Recent upgrades

What’s already been renewed

2022–2023

Elevators modernized

Otis modernization for smoother, more reliable rides.

2023

New hot-water plant

Old boilers replaced with a new domestic hot-water system.

2025

Laundry rooms renovated

Laundry room repairs and renovation completed.

2025

New roof

Full roof replacement under independent engineering oversight.

2025

First balcony lines

The 14-line and 02-line balconies were repaired.

2023

Amazon Hub lockers

A dedicated locker room for 24/7 package pickup.

2026 · New requirement

A water safety program for the building

New Jersey now requires large residential buildings to run a Water Management Program that keeps the hot-water system at safe temperatures and prevents bacteria growth. The James Monroe’s plan was developed in 2026.

Hot water at safe temperatures

Sensors on the hot-water loops are monitored around the clock.

Occasional flushing

You may see staff flushing taps in common areas. This is routine.

Tell us about problems

If your hot water is lukewarm or rusty, report it to the Front Desk.

On the drawing board

Lobby, front desk and security

A new concierge desk

A redesigned front desk is being planned for the lobby, with better space for package handling.

Security camera network

The camera network between the package room and IT closet is being upgraded for reliability.

Resident Lounge refresh

Ideas for making the Resident Lounge more welcoming are under review.

These projects are in planning. Details and timing will be shared at open Board meetings.

Stay informed

You’ll always get notice before work reaches your floor.

BuildingLink notices

Dates, affected lines and floors, and what you need to do.

Open Board meetings

Project updates and Q&A every month on Zoom.

This website

The home page and this presentation are updated as work progresses.

In this presentation